V3 | Planswift Earthwork Pro
The report shows 15,000 CY Cut and 5,000 CY Fill. You have 10,000 CY of excess. In v3, you can drag a "Borrow/Waste" pit onto the plan. The software updates the haul distance and disposal cost instantly.
Draw the building footprint (proposed subgrade at EL 98). Draw the pond bottom (EL 95) with side slopes at 3:1. Draw the parking lot with a 2% slope using the "Slope Plane" tool.
Open PlanSwift, load the architect’s PDF. Use the calibration tool to set the scale by clicking a known dimension (e.g., a 100-foot property line). The "PlanSwift Earthwork Pro v3" toolbar appears. planswift earthwork pro v3
Using manual grid and scale methods, the estimator bid the project at 22,500 CY cut and 18,000 CY fill, requiring haul-off of 4,500 CY at $10/CY ($45,000 cost).
Stop guessing where the dirt goes. Start knowing with . Disclaimer: Features and pricing mentioned are accurate as of the publication date. Always visit the official PlanSwift website for the latest information on PlanSwift Earthwork Pro v3 licensing and system requirements. The report shows 15,000 CY Cut and 5,000 CY Fill
| Feature | PlanSwift Earthwork Pro v3 | Agtek (Gradework) | Manual / Excel | | :--- | :--- | :--- | :--- | | | Low (2 days) | High (2 weeks) | N/A (Expert needed) | | Price | Mid-range (Perpetual license) | High ($5k+) | Low (but slow) | | 2D PDF Import | Native, drag-and-drop | Clunky, requires conversion | Yes, but manual scaling | | 3D Visualization | Basic but functional | Advanced photorealistic | None | | Speed (10-acre site) | 30 min | 45 min | 4+ hours | | Machine Control Export | Yes (DXF) | Yes (Proprietary) | No |
Click "Generate Report." You receive a line-item breakdown ready to copy into HeavyBid or Excel. Total time elapsed: 22 minutes. Manual method time: 4 hours. Part 4: PlanSwift Earthwork Pro v3 vs. Competitors How does v3 compare to other heavy hitters like Agtek, Kubla Cubed, or Tally Systems? The software updates the haul distance and disposal
Select all features. Click "Earthwork Pro v3 → Compute Volumes." The software overlays a grid, calculates the difference between existing and proposed surfaces, and displays the color-coded map (Red = Cut, Blue = Fill).